When using Contone printers, no dot sizes are available for calculating ink costs.

Dithering, i.e. the dot distribution in the printout (simplified explanation), for Contone drivers cannot be carried out by the Ergosoft RIP, so that no corresponding data is available for calculating the ink quantity.

 

"How can the ink costs still be calculated for these drivers?"

 

Note: To be able to calculate the virtual drop size, you need to know the actual consumption. This information may be available via the printer control panel, front-end software, ink tank monitoring, ...


Solution/Work-Around

To obtain the estimated ink consumption, proceed as follows:

  1. Open the Contone Print Environment
  2. Select "Cost Factors"
  3. Set the "Dot Volume" to User
  4. Enter a value for the "Ink Volume" of e.g. 10 pl
  5. Close the Print Environment

Then print out a file and open the JobTicket. Now, ink consumption has been estimated and costs are calculated.

Compare these values with those from the printer control panel or the front-end software, for example.

 

Use the following formula to calculate the Virtual Drop Size:

Actual amount (printer control panel or front end) * estimated drop size (manually entered ink volume) / calculated amount (JobTicket) = Virtual Drop Size


Related Articles & Links

    • Related Articles

    • Difference between ink assignment in the Print Environment and printer

      Problem/Question In some Print Environments, the ink assignment shows only CMYK although the printer has additional spot color channels (e.g. orange, blue, green, light colors etc.). Additionally, there is the problem that no Cost Calculation is ...
    • Cannot Change Ink Assignment

      Problem/Question When adding a Print Environment, everything in Print Settings/Ink Assignment is grayed out and the Inks used cannot be changed. Solution/Work-Around  For certain printer models the Ink Assignments cannot be changed in the RIP due ...
    • How to setup CostManager

      Problem/Question How to setup Cost Manager Solution/Work-Around Manage Media List Run CostManager and go to tab "Manage Media List" Click <New> to add Media to the list Insert the Cost Factor and an optional Description and confirm with <OK>  Give a ...
    • Calculate media consumption

      Problem/Question The media consumption on the JobTicket shows only the media lenght “How can I switch to square meters?" If width (and length) of the loaded media are not set in the PrintQueue, the job dimensions are used to calculate the media ...
    • Currency change for Cost Calculation

      Problem/Question The default setting for the currency in Ergosoft RIP is USD. This can be changed to one of the additional 25 currencies at any time. "How can I change the currency for the Cost Calculation?" Solution/Work-Around Open the "Application ...