RIP Engines configuration

RIP Engines configuration

Problem/Question
No rip processes are performed. No RipEngine seems to be active.
How to change the number of active RipEngines?

At least one RipEngine is required to perform a rip process. Raster performance of the Ergosoft RipEngine mainly depends on the processor.
It is possible to configure the RipEngine so it uses multiple cores.

Solution/Work-Around
  1. Open the Ergosoft ControlCenter
  2. Select the tab "RIP & Programs"
  3. Control how many RipEngines started in the "RipEngines to be managed" field
In addition you can change
  1. the number of automatically started RipEngines
  2. the number of threads to be used per RipEngine
You can also see the maximum count of available RipEngines.

In Ergosoft 16 Sequoia there are additional things to consider:
  1. The number of RipEngines can be distributed to the output workstations according to your requirements
  2. The total number of RipEngines to be distributed depends on your license
  3. The standard quantity for Sequoia are sixteen (16)
  4. The default setting for the number of RipEngines on each Sequoia workstation is 0

Related Articles & Links



    • Related Articles

    • TrueShapeNesting on Networked Departments (Sequoia)

      Problem/Question On Networked Departments systems (formerly Sequoia), it is not possible to do TSN on the Client PCs. Solution/Work-Around Per Default, the TEMP folder on the Master (_Server\Files\TEMP) is set to store TSN generated PDF files. This ...
    • Where do you rip in Sequoia?

      Problem/Question A fundamental question that is asked again and again: “Where do you rip in Sequoia?" This is important for the System Requirements to know. Solution/Work-Around In Sequoia, ripping is always performed on the Client on which the ...
    • Sequoia Program Feature configuration

      Problem/Question How to activate or deactivate options for Client PCs in Sequoia. The Sequoia license specifies which options can be activated. Each of the enabled functions can be activated/deactivated at Ergosoft ControlCenter. Solution/Work-Around ...
    • Sequoia Master PC crash

      Problem/Question The Sequoia Master PC is crashed or is temporarily not available. Solution/Work-Around Procedure using a new PC: Install the latest Version of Ergosoft Follow the Installation Description Note: be sure to have the same release ...
    • Networked Department Start order (Error messages when Client start)

      Problem/Question The following messages may appear when starting a Network Department Client: If this message does not disappear in seconds/minutes, the Client can't connect to the Master. (A permanent network connection between all Networked ...